1.
Sampath K, Tezabwala A, Chabrier A, Payne J, Tiozzo F. Integrated Operations (Re-)Scheduling from Mine to Ship. ICAPS [Internet]. 2013Jun.2 [cited 2024Apr.27];23(1):416-24. Available from: https://ojs.aaai.org/index.php/ICAPS/article/view/13585