[1]
K. Sampath, A. Tezabwala, A. Chabrier, J. Payne, and F. Tiozzo, “Integrated Operations (Re-)Scheduling from Mine to Ship”, ICAPS, vol. 23, no. 1, pp. 416–424, Jun. 2013.