Chen, D. Z., & Bercher, P. (2022). Flexible FOND HTN Planning: A Complexity Analysis. Proceedings of the International Conference on Automated Planning and Scheduling, 32(1), 26-34. https://doi.org/10.1609/icaps.v32i1.19782