[1]
Nicolò, G., Ferrer, S., Salido, M.A., Giret, A. and Barber, F. 2021. A Multi-Agent Framework to Solve Energy-Aware Unrelated Parallel Machine Scheduling Problems with Machine-Dependent Energy Consumption and Sequence-Dependent Setup Time. Proceedings of the International Conference on Automated Planning and Scheduling. 29, 1 (May 2021), 301-309. DOI:https://doi.org/10.1609/icaps.v29i1.3492.