[1]
Wang, Z. and Gombolay, M. 2022. Stochastic Resource Optimization over Heterogeneous Graph Neural Networks for Failure-Predictive Maintenance Scheduling. Proceedings of the International Conference on Automated Planning and Scheduling. 32, 1 (Jun. 2022), 527-536. DOI:https://doi.org/10.1609/icaps.v32i1.19839.