[1]
Sampath, K. et al. 2013. Integrated Operations (Re-)Scheduling from Mine to Ship. Proceedings of the International Conference on Automated Planning and Scheduling. 23, 1 (Jun. 2013), 416–424. DOI:https://doi.org/10.1609/icaps.v23i1.13585.