[1]
Taig, R. and I. Brafman, R. 2013. Compiling Conformant Probabilistic Planning Problems into Classical Planning. Proceedings of the International Conference on Automated Planning and Scheduling. 23, 1 (Jun. 2013), 197–205. DOI:https://doi.org/10.1609/icaps.v23i1.13540.