[1]
Keller, T. and Eyerich, P. 2012. PROST: Probabilistic Planning Based on UCT. Proceedings of the International Conference on Automated Planning and Scheduling. 22, 1 (May 2012), 119-127. DOI:https://doi.org/10.1609/icaps.v22i1.13518.