[1]
Della Penna, G., Intrigila, B., Magazzeni, D. and Mercorio, F. 2010. A PDDL+ Benchmark Problem: The Batch Chemical Plant. Proceedings of the International Conference on Automated Planning and Scheduling. 20, 1 (May 2010), 222-225. DOI:https://doi.org/10.1609/icaps.v20i1.13430.